Aller au contenu principal

DÉCOUVRIR

Antiguo puente del ferrocarril

  • Image
    Antiguo puente del ferrocarril

Weather information is temporarily unavailable.

36002 Pontevedra
Spain

Teléfono
En savoir plus sur
Pontevedra
The building of this bridge started in 1898. The structure was finished in one year. To build it, they needed to put two masonry stirrups in the margins and two large pairs of cylindrical metal piles braced in the middle of the river. Finally, the railway line to Santiago started working on 23 July 1899 and the bridge was used for 67 years.
Ville la plus proche:

Vilagarcía de Arousa

Notez cette ressource
Description de l'environnement
Urbain
Chronologie
S. XIX
Organisme responsable
Concello de Pontevedra
Propriété
Public
État de conservation
Besoin de réadaptation